
1.
Locate the following components: Equipment rack screws (4)
2.
Lift the Acme Packet 4600 into the correct position in the equipment rack.
3.
Use a #2 Phillips screwdriver to secure two screws through the
mounting flanges on the Acme Packet 4600 and into the equipment
rack. One person should hold the Acme Packet 4600 in the correct
position while the other person screws the Acme Packet 4600 in place.
4.
Ensure that the Acme Packet 4600 chassis remains supported until you have
completely installed it into the equipment rack.
Fan Module Installation
The fan module is pre-installed in the Acme Packet 4600 chassis when it ships. There
is no need to remove the fan module prior to installation. In the event that this part
needs service or replacement, you can remove and replace it with a functioning one.
Ground and Power Cable Installation
The Acme Packet 4600 must be properly grounded to ensure efficient system
performance. Grounding your Acme Packet 4600 chassis is an extremely important
part of the installation and maintenance procedures. Physical harm or problems with
system functionality may occur on the Acme Packet 4600 if it is not properly grounded.
If your Acme Packet 4600 chassis is not properly grounded, the system can exhibit
unpredictable problems such as:
•
Garbled output on the console display
•
Sudden crashes
•
Physical damage to the Acme Packet chassis and its hardware components
Note:
Failure to ground the chassis properly can result in permanent damage to the
Acme Packet 4600 and its components. Bodily harm may also result under
some circumstances.
Note:
The Acme Packet 4600 does not support mixing AC and DC power supplies
in the same chassis. A mixed power configuration is prohibited.
Chapter 4
Fan Module Installation
4-12