90
M4RTU/M4 I/O User’s Guide
WORKSHEETS
FIELD WIRING WORKSHEET
The following worksheet can be used to plan and implement field wiring installation for the M4RTU/M4 I/O
base unit and M4RTUX I/O Extender.
Worksheet Instructions
Fill in the wire name boxes for each terminal. The Field Wiring Worksheet can be used by your installer during
RTU installation. If you need additional worksheets, make copies before filling this out.
Figure F-4: Field Wiring Worksheet Example 1
Summary of Contents for Modular M4RTU
Page 6: ...6 M4RTU M4 I O User s Guide TABLE OF CONTENTS...
Page 74: ...74 M4RTU M4 I O User s Guide FIELD WIRING...
Page 80: ...80 M4RTU M4 I O User s Guide PRODUCT SPECIFICATIONS...
Page 82: ...82 M4RTU M4 I O User s Guide ADDRESS JUMPER CONFIGURATION...
Page 86: ...86 M4RTU M4 I O User s Guide UPGRADING RAM AND FLASH EEPROM...
Page 89: ...M4RTU M4 I O User s Guide 89 WORKSHEETS Figure F 3 M4RTUX I O Extender I O Module Worksheet...
Page 91: ...M4RTU M4 I O User s Guide 91 WORKSHEETS Figure F 5 Field Wiring Worksheet Example 2...
Page 94: ...94 M4RTU M4 I O User s Guide WORKSHEETS...