OMS LINEA ESSE S.T.01/3S ED.0 REV.14 03/2017
61
15.
Remove the guard of the floor box, removing the handle of the tap (C in the figure in the FUSE
REPLACEMENT paragraph) and loosening the screw next to the tap, to connect the water and air (see
the CONNECTIONS par.), suction and drain.
16.
Proceed with the electrical connection in the floor box, connecting the cables from the spittoon unit
and the transformer electronic board, and, lastly, the power mains (general terminal); general
terminal board power wires must be secured with nylons straps to the specifically perforated
insulated base and placed under the terminal. Specifically, it must be guaranteed that, in the event of
a fault of the fastening devices (straps), the protection conductor is not taut so long as the mains
conductors are still connected to the terminal. If the cables of the electrical network come from
underneath the spittoon unit, they must go through a sleeve and then connected to the terminal
board inside the floor box.
17.
fit the accessories (instruments), if any, on the instrument and dental assistant tables.
Note: if required, the instrument arm and table can be disassembled:
a.
unplug the electric, pneumatic and water connections;
b.
pull out the instrument arm upwards, using small rotating movements;
c.
after positioning the equipment, re-install the arm; we recommend checking and adjusting the fixed
arm rotation clutch, if necessary (see the CLUTCH ADJUSTMENT paragraph);
d.
restore the electrical, hydraulic and pneumatic connections inside the chair support arm.
Note:
Refer to the wiring and installation diagrams provided for all electrical connections.
Summary of Contents for LINEA ESSE
Page 1: ...Instruction handbook Dental Unit LINEA ESSE...
Page 5: ...OMS LINEA ESSE S T 01 3S ED 0 REV 14 03 2017 5 Version with floor spittoon unit...
Page 50: ...OMS LINEA ESSE S T 01 3S ED 0 REV 14 03 2017 50 Note Check for condensate on a weekly basis...
Page 69: ...OMS LINEA ESSE S T 01 3S ED 0 REV 14 03 2017 69...
Page 70: ......