6
F3SJ-B-02TS
Quick Installation Manual
6-4. External dimensions to attach the top/bottom brackets (F39-LJB1) and intermediate brackets (F39-LJB2)
■
Dimensions (Check position)
M3 x 6 screw
M3 x 6 screw
P
(beam
gap)
C (Protective height)
Top/Bottom
Bracket
(F39-LJB1)
Top/Bottom
Bracket
(F39-LJB1)
Intermediate
Bracket
(F39-LJB2)
<M5 screw fixed>
<M8 screw fixed>
19
B
B
E
C
C
E
42
42
5.9
5.9
22
22
4-M5
2-M8
2-M5
2-M5
19
42
13.4
13.3
2
22
5.9
B
E
A
6.5
53
30
5.5
D
34.5
22.5
dia.9
48
35
46.8
33.6
[ Unit : mm ]
[Backside mounting]
If the protective height exceeds 545 mm, use the intermediate brackets as many as and on the positions specified in the
dimensional drawing. Otherwise ratings/specifications cannot be satisfied.
If load is applied to the sensor unit in your environment, add intermediate bracket(s).
Dimensions A to E and P
Dimensions E
* Value E must be 530 mm or less when not using value E obtained from the calculation above.
A
C+69
B
C+42.2
C
4-digit number of the type name (protective height)
D
C-45
E
Depends on the protective height. See the table below.
P
20
Protective height
Number of Intermediate Brackets
Dimensions E
0225 to 0545
0
-
0625 to 1105
1
B
/2
1185 to 1585
2
B
/3
1665 to 1985
3
B
/4
Check
position
Step1
Mount
Step2
Align
beams
Step3
Mounting/Beam Alignment
Wiring
Function Selection
Pre-Operation Checklist /
Maintenance Checklists
Summary of Contents for Sti F3SJ-B P25-02TS Series
Page 15: ...F3SJ B P25 02TS OMRON Corporation 2017 2018 All Rights Reserved Original instructions...
Page 17: ...2 F3SJ B 02TS 2 3 3 4 5 10...
Page 18: ...3 F3SJ B 02TS 4 F3SJ B 02TS...
Page 22: ...7 F3SJ B 02TS 6 2 1 2 6 1...
Page 23: ...8 F3SJ B 02TS 3 4...
Page 24: ...9 F3SJ B 02TS 5 F39 LJB2 30 6 M3 8 M3 18 1 EMITTER RECEIVER...