The Box PC is ON and if an operating system is installed it will start.
Precautions for Safe Use
Always use the SMART monitoring feature for storage devices that do not comply to the Omron
Storage Device Specifications. Monitor the operating temperature and vibrations to ensure they
stay within the environmental specifications of the storage device.
Additional Information
• The first time initialization will prepare the system and automatically reboot the Box PC when
required.
• Install support software to fully utilize your Box PC and optional connected hardware like the
Industrial Monitor.
5 Installation
5 - 45
NY-series Industrial Box PC User's Manual (W553)
5-6 Initial Power ON
5
5-6-1 Initial Power ON Procedure
Summary of Contents for NYB17-11
Page 30: ...Sections in this Manual 28 NY series Industrial Box PC User s Manual W553...
Page 38: ...1 Overview 1 8 NY series Industrial Box PC User s Manual W553...
Page 60: ...2 Hardware 2 22 NY series Industrial Box PC User s Manual W553...
Page 218: ...7 Maintenance 7 42 NY series Industrial Box PC User s Manual W553...
Page 239: ...I Index I 1 NY series Industrial Box PC User s Manual W553 I...
Page 242: ......
Page 243: ......