![Omron NY Series Manual Download Page 89](http://html1.mh-extra.com/html/omron/ny-series/ny-series_manual_742784089.webp)
SAP in NS-Runtime
Overview of the functional differences for macros in NS-Runtime.
Folder
SAP name
Details
PLC
Time
If you do not start NS-Runtime
with administrator right, you will
not be able to change the time of
the PC.
PLC
Synchronize time
PLC
PLC→NS clock adjust
Thermo
E5 series, EJ series, SAP
NS-Runtime doesn't support direct
connection with the thermo con-
troller. Replace with SAP for serial
communication.
5-2-4
Modify Object Dimensions, Fonts and Screen Resolution
This section provides details on how to modify Object Dimensions, Fonts and the Screen Resolution.
NS Projects have an original resolution of 320 x 240 pixels where the Panel PC will be much higher.
As a result the original content will, after conversion, be displayed in an unusable small area on the
screen.
During the conversion procedure the NS Project is converted to a model with a screen resolution simi-
lar to the target screen resolution. Refer to
5-2-2 Convert Model of an NS Project to NS-Runtime
page 5-5 for details.
The fontsize does not change, so please enlarge it manually.
To correct dimensions and the screen resolution:
1
Modify the object dimensions.
Use the Property List of the objects to set Width, Height, X and Y.
2
Modify the font sizes.
Use the Property List of the Label to set font type and font size.
Use the Text tab of the Numeral Display & Input objects to set Text Attributes.
3
Modify the screen resolution.
Refer to
5-2-5 Modify Screen Resolution for an NS-Runtime Project
The object dimensions, fonts and screen resolution are modified for the NS-Runtime project.
5 Conversion Procedures
5-17
NY-series NYE Industrial Panel PC Conversion Guideline for NS-series products (P157)
5-2 Software Conversion
5
5-2-4
Modify Object Dimensions, Fonts and Screen Resolution