![Omron NY Series Manual Download Page 82](http://html1.mh-extra.com/html/omron/ny-series/ny-series_manual_742784082.webp)
Ethernet
Ethernet settings do not change during the conversion from NS Projects to NS-Runtime but the
node address needs to be set.
Thet field for setting the IP address
B
cannot be edited but with the PCs port addresss communi-
cation can be established with the PLC. To achieve this set the node address
A
to the lowest 3
digits of the IP address of the PC.
A
B
C
For the FINS protocol, set the IP address and node address of the connection destination PLC not
only with the node address but also in the conversion table
C
. E.g. Node 1, IP Address
192.168.250.1.
Controller Link
Controller Link is not supported by Windows, starting with Windows 7 and onwards.
Converting a project with Controller Link will not cause an error, but there will be no functionality
when running NS-Runtime on the Panel PC.
5 Conversion Procedures
5-10
NY-series NYE Industrial Panel PC Conversion Guideline for NS-series products (P157)