51
FA-M3 Series
Section 7-1
7-1-1
Connecting through a Personal Computer Link Module.
Connection Diagram
7-1-2
Direct Connection to CPU Module
Connection Configuration
between PLC and PT
As shown below, connect the PLC to a KM11-2T Programming Tool Cable
and then connect the cable and the PT as shown below.
Connection Diagram
CPU
Personal
Computer Link
Module
Connection diagram
PT
F3SP21-0N
F3SP25-2N
F3SP28-3N
F3SP28-3S
F3SP35-5N
F3SP38-6N
F3SP38-6S
F3SP53-4H
F3SP53-4S
F3SP58-6H
F3SP58-6S
F3SP59-7S
F3LC11-1N
F3LC11-1F
F3LC12-1F
NV3W, NV4W,
or NV3Q for
RS-232C
Pin No.
Signal
1
RD
ER
PLC
SG
SD
RS
CS
DR
2
3
4
5
6
7
9
8
Pin No.
Signal
1
+
-
SD
RD
FG
2
3
4
5
6
NC
NC
SG
7
8
PT
To power
supply
PT
PLC
Yokogawa Programming Tool Cable (KM11-2T)
CPU
Conversion
cable
Connection diagram
PT
F3SP21-0N
F3SP25-2N
F3SP28-3N
F3SP28-3S
F3SP35-5N
F3SP38-6N
F3SP38-6S
F3SP53-4H
F3SP53-4S
F3SP58-6H
F3SP58-6S
F3SP59-7S
KM11-2T
NV3W, NV4W,
or NV3Q for
RS-232C
Pin No.
Signal
1
SD
DR
Cable
SG
RD
CS
RS
ER
2
3
4
5
6
7
9
8
Pin No.
Signal
1
+
-
SD
RD
FG
2
3
4
5
6
NC
NC
SG
7
8
PT
To power
supply
-
-
Summary of Contents for NV3Q Series
Page 1: ...Cat No V105 E1 02 Programmable Terminals NV Series NV3W NV4W NV3Q HOST CONNECTION MANUAL ...
Page 2: ......
Page 3: ...NV Series NV3W NV4W NV3Q Programmable Terminals Produced December 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 16: ...xvi ...
Page 20: ...xx ...
Page 68: ...44 S7 200 Series Section 5 1 ...
Page 69: ...45 SECTION 6 Connecting to LG PLCs 6 1 MASKER K Cnet Series 46 6 1 1 Connection Method 46 ...
Page 72: ...48 MASKER K Cnet Series Section 6 1 ...
Page 76: ...52 FA M3 Series Section 7 1 ...
Page 110: ...86 Web Controller Series Section 9 3 ...
Page 120: ...96 Modbus RTU Mode Temperature Controller Section 10 3 ...
Page 142: ...118 Modbus Connections Section 12 5 ...
Page 144: ...120 Revision History ...