78
12 Set all data as shown in the screenshot.
13 Download the application into the PLC.
14 Click
Windows
in
View
menu and select
Watch
.
15 Enter
D0
in the first line in the
Watch
window.
16 Change Datatype to Uint
17 Connect the cable to the NQ-Series and PLC. Ensure the label on the cable corresponds with the NQ-Series
and PLC (cable connectors are both male). Refer to A-2-2 NQ to PLC (NQCN222 / NQCN521).
18 Check the blue LED. If the blue LED is steady on, a correct connection has been established.
19 Enter
89
in the NQ-Series’ screen. If the connection has been correctly established the same value is shown
in the
Watch
window of CX-Programmer.
Note
The following messages are displayed on the NQ-Series’ screen if problems occur:
• !!! no connection
• ??? connection established, address unknown
Summary of Contents for NQ HMI
Page 1: ...NQ Series HMI GETTING STARTED GUIDE Cat No V07 EN 01 NQ3 TQ0 B NQ3 MQ0 B NQ5 SQ0 B NQ5 MQ0 B...
Page 2: ......
Page 6: ......
Page 14: ...Conformance to EC Directives Section 1 7 xiii...
Page 20: ...Specifications per model Section 2 4 6...
Page 78: ...Debugging Section 6 2 64...
Page 88: ...NQ Series diagnostics Section 7 4 74...
Page 144: ...130...