Basic Operating Procedure
Section 1-4
1-4
Basic Operating Procedure
1-4-1
Overview
The following diagram provides an overview of the installation procedures.
For experienced installation engineers, this may provide sufficient informa-
tion. For others, cross-references are made to various sections of this manual
where more explicit information is given.
Mount the GRT1-PRT PROFIBUS Unit and
the SmartSlice I/O Units
(See section
2-2 Installing the GRT1-PRT
Unit
)
Wire the GRT1-PRT PROFIBUS Unit and the
SmartSlice I/O Units
(See section
2-3 Wiring the GRT1-PRT
)
Setup the PROFIBUS network
(See section
2-4 Setting up a PROFIBUS
Network
)
Configure the PROFIBUS DP Master Unit
(See section
3-3 Setup the GRT1-PRT
Configuration
)
PROFIBUS DP starts communicating,
confirmed by the COMM LED continuously
lit. Check status of other LED Indicators (See
section
3-4 Operating the Network
)
Power up the GRT1-PRT and Perform initial
setup (See section
3-3 Setup the GRT1-PRT
Configuration
)
Summary of Contents for GRT1 - 27-11-2006
Page 3: ...ii ...
Page 9: ...viii ...
Page 13: ......
Page 49: ......
Page 95: ......
Page 105: ...86 Explicit Messages Appendix C ...
Page 109: ......
Page 111: ......