![background image](http://html1.mh-extra.com/html/omron/cr_udg4_nr/cr_udg4_nr_user-manual_743957021.webp)
3
Installa
tion
3-1
1. Unpacking
1.1
Unpacking the shipping box
The robot comes in a special shipping box.
The following step must be carried out to remove the cover from the box:
• unscrew the screws from the cover of the wooden box
• Now remove the cover
1.2
Check the damage
first take out the individual components from the package and check that everything is complete according to the
following list:
• 1 x rotational axis (in case of cR_ugD4_R model)
• 1 x adaptor ring for the rotational axis gear or motor (in case of cR_ugD4_R model)
• 1 x tcP - tool center Point (in case of cR_ugD4_NR model)
• 6 x secondary arms
• 6 x spring package (12 x spring brackets and 12 x spring)
Check all the components and the robot for transportation damage.
1.3
Lifting and transportation
Before the robot is lifted, it must be ensured that it is free from obstructions.
Remove all the screws where the robot is mounted with in the box.
1
No.
Description
1
3 x screws with protection material
The robot must be lifted and transported by using lifting tackle or a forklift truck. Two lifting straps has to be attached
into two eyebolts that are screwed into the baseplate. The lifting straps has to be long enough and must be routed in
such a way that the robot is not damaged.
Summary of Contents for CR_UDG4_NR
Page 1: ...ZX T Series Cat No I192E EN 01 Delta Robot USER S MANUAL Delta Robot CR_UGD4 Series...
Page 2: ......
Page 6: ......
Page 12: ......
Page 15: ...Chapter 2 Model overview Contents 1 Overview 2 1...
Page 16: ......
Page 18: ......
Page 20: ......
Page 32: ......
Page 34: ......
Page 39: ...Chapter 5 Robot settings Contents 1 Kinematics 5 1 2 Workspace 5 2 3 Software limits 5 3...
Page 40: ......
Page 44: ......
Page 46: ......
Page 48: ...6 Specifications 6 2 2 External view and dimensions 67 0 ULSSHU GLPHQVLRQV 0...
Page 52: ......