![Omron CPM2C Operation Manual Download Page 62](http://html1.mh-extra.com/html/omron/cpm2c/cpm2c_operation-manual_742519062.webp)
3-3
Section
# !
1, 2, 3...
1. Remove the cover from the CPU Unit’s or the Expansion I/O Unit’s Expan-
sion I/O Unit Connector. If the cover is difficult to remove, use a flat-blade
screwdriver to pry the cover from the Expansion I/O Connector.
Expansion I/O
Connector cover
2. Align the Expansion I/O Unit and CPU Unit (or previous Expansion I/O Unit)
so that the catches (top and bottom) on the Expansion I/O Unit and the con-
nectors fit together. Press the Units together to connect them.
3. Lock the Units together by closing the locks (top and bottom) on the CPU
Unit (or previous Expansion I/O Unit). Place the cover (included with the
CPU Unit) on the last Expansion I/O Unit’s Expansion I/O Connector.
Expansion I/O
Connector cover
Slide to lock
Units together.
Summary of Contents for CPM2C
Page 1: ...CPM2C Programmable Controllers Operation Manual Produced June 1999...
Page 2: ...http www bzxindaxin com http www gk world com...
Page 3: ...http www bzxindaxin com http www gk world com...
Page 4: ...http www bzxindaxin com http www gk world com...
Page 5: ...http www bzxindaxin com http www gk world com...
Page 6: ......