4.9
Checks before use
Having completed installation of the lift, the following test must be performed before it can be used for
work.
vvasa
TEST
STANDARDS
1
Lift leveling
Max. 0.5 mm per meter
2
GAP between the plates and the height of the
spring
(see: Check)
3
Sturdiness of anchors fastening to the floor
Tightening torque (50 Nm or 37 Lb-Ft)
4
Pneumatic connections
Diagram
(see: Pneumatic diagram paragraph)
Air
leakage
5
Hydraulic connections
Diagram (
see: Hydraulic Diagram paragraph)
Oil leakage
Pressure
6
Wiring
Diagram
(see: Wiring Diagram)
7
Safety devices
(See: Safety device features paragraph)
8
The compressed air system must be powered by
filtered and lubricated air
Presence of a filtering system
9
Oil level
Oil level rod
10
Direction of rotation of motor
Arrow on motor
11
Plant cable and piping protection
Cable and pipe covers provided
12
In case of upstroke from opposite side to the
torsion bar
Presence of up ramp (optional)
13
Never load vehicles whose overall dimension
exceed those of the lift
Loading conditions
(see paragraph: Loading
conditions)
14
Never load vehicles weighing more than the lift’s
nominal capacity
Capacity indicated on plate
DATE
DATE
SIGNATURE
Summary of Contents for Kar 350
Page 7: ......
Page 8: ...2 4 Loading Conditions...
Page 16: ...LIFT...
Page 17: ...19...
Page 19: ...LABEL 6 LABEL 7 LABEL 8 LABEL 9 LABEL 10...
Page 20: ...LABEL 11 LABEL 12 LABEL 13...
Page 26: ...JOIN THE HOSES RESPECTING THE NUMBERING HOLE FOR THE HOSE...