
4.4.2. Pneumatic connections
• Uncoil the pneumatic hose connected to EV2.
• Bring the pneumatic hose from the control unit to the lift, through the hole at the base of
the control unit.
• Join the hoses from the platform with the hose from the control unit with a Tee coupling
4.4.3. Electric connection
The electric supply system must include:
• a main switch with a circuit breaker;
• fuses or thermal protection suited to the machine’s characteristics;
• device against accidental contact, for protection
The switch must be positioned in the immediate vicinity of the machine in full compliance with
local regulations.
Power cables must have a suitable section for absorbing current, without deviations for other
utilities.
Electrical System shall be designed to meet all local / national codes and shall be properly
grounded.
The power cable must be locked in the dedicated cable gland and the electric panel must be
carefully closed to assure the required IP 54 protection.
Only connect the machine to type approved sockets with grounding cable of proven efficiency.
Periodically have qualified personnel check the correct tightening of the electric cables of the
various components.
HOLE FOR THE HOSE
HOLE FOR THE HOSE
HOLE FOR THE HOSES PASSAGE
EV2
Summary of Contents for Kar 350
Page 7: ......
Page 8: ...2 4 Loading Conditions...
Page 16: ...LIFT...
Page 17: ...19...
Page 19: ...LABEL 6 LABEL 7 LABEL 8 LABEL 9 LABEL 10...
Page 20: ...LABEL 11 LABEL 12 LABEL 13...
Page 26: ...JOIN THE HOSES RESPECTING THE NUMBERING HOLE FOR THE HOSE...