4.5. Filling of the circuit Master-Slave
1.Turn the taps on
2. Push button PS / UP till when the lift start lifting
3. Turn the taps off
4. Push button PS / UP till the complete opening of the divider
5. Turn the taps on
6. For each cylinder
a. Push button PS / UP till max height of the lift
b. Allow air to escape from the air valve till the lift leans on the mechanical safety locks
Repeat point 6 all cylinders
7. Push PS / UP till the max height of the lift
8. Turn the taps off
PROCEDURE TO BE EXECUTED
ONLY DURING THE INSTALLATION
PS
TAPS
BLEEDING
FITTING
Summary of Contents for Kar 350
Page 7: ......
Page 8: ...2 4 Loading Conditions...
Page 16: ...LIFT...
Page 17: ...19...
Page 19: ...LABEL 6 LABEL 7 LABEL 8 LABEL 9 LABEL 10...
Page 20: ...LABEL 11 LABEL 12 LABEL 13...
Page 26: ...JOIN THE HOSES RESPECTING THE NUMBERING HOLE FOR THE HOSE...