Replacing the Batteries
1. Remove the corner screws from the meter
face and lift the display electronics from
the turbine.
2. Remove the batteries.
3. Check the battery terminals and remove
any corrosion.
4. Install the new batteries and make sure
the positive posts are positioned correctly.
When the batteries are installed correctly,
the computer powers on automatically
and the readout displays information.
5. Make sure the seal is fully seated before
placing the computer electronics on the
turbine. Tighten the four screws.
7
Summary of Contents for FTB380 Series
Page 1: ...FTB380 SERIES Aluminum Turbine Flowmeters...
Page 2: ......
Page 14: ......
Page 15: ......
Page 16: ...M 5065 1111...