
Replacement of Consumables
/
Maintenance Manual
4-6
Page
6 L-arm Vacuum Pad
Tools
Phillips-head screwdriver (No. 2)
Accessories
1)
Remove the two M3 cross recessed countersunk screws
, and
remove the L-arm from the loader main body.
2)
Put the L-arm on a flat surface and replace the vacuum pad
.
3)
After attaching the L-arm to the loader main body, check that the
clearance between the L-arm and the A-arm is uniform. If the
clearance is not uniform, check that the L-arm is properly
attached, and attach it again if necessary.
Replacement Cycle
Transfer of 350 thousand wafers
Standard Working Time
20 minutes
AL120-6 series
L-arm
A-arm
AL120-86 series
L-arm
A-arm
Summary of Contents for AL120-6Series
Page 2: ...This page intentionally left blank ...
Page 9: ...Operation Maintenance Manual Introduction Safety Precautions i 7 Page AL120 86 Series Unit mm ...
Page 16: ...Introduction Conformity Standards Operation Maintenance Manual i 14 Page ...
Page 17: ...Operation Maintenance Manual Introduction Conformity Standards i 15 Page ...
Page 20: ...Maintenance Manual Table of Contents C 2 This page intentionally left blank Page ...
Page 56: ...Test Programs Maintenance Manual 3 26 Page This page intentionally left blank ...
Page 64: ...Replacement of Consumables Maintenance Manual 4 8 Page This page intentionally left blank ...