
Maintenance manual
Adjustments
2-5
5) Elevator height (arm insertion and removal height) setting registration
Preparation
Tools
Page
Phillips-head screwdriver (No. 2)
Hexagonal wrench (with an opposite side distance of 5.5 mm)
Items to prepare
The cassette and wafers to be registered
1)
Turn the main switch OFF.
2)
Remove the four M3 binding machine screws
on the left side
of the loader main unit. Remove the elevator cover
.
3)
Loosen the three M3 hexagon nuts
, and remove the partition
plate
.
Summary of Contents for AL120-6Series
Page 2: ...This page intentionally left blank ...
Page 9: ...Operation Maintenance Manual Introduction Safety Precautions i 7 Page AL120 86 Series Unit mm ...
Page 16: ...Introduction Conformity Standards Operation Maintenance Manual i 14 Page ...
Page 17: ...Operation Maintenance Manual Introduction Conformity Standards i 15 Page ...
Page 20: ...Maintenance Manual Table of Contents C 2 This page intentionally left blank Page ...
Page 56: ...Test Programs Maintenance Manual 3 26 Page This page intentionally left blank ...
Page 64: ...Replacement of Consumables Maintenance Manual 4 8 Page This page intentionally left blank ...