
45
8
C10/11
Belgium power Grid.
9
G99
UK power Grid.
10
China
China power Grid, meet Grid standards “CN-NBT”.
11
VDE0126-FR
France power Grid, meet Grid standards “VDE 0126”.
12
EN50549-PL
Poland power Grid.
13
Brazil-180s
Brazil power Grid, connect/reconnect time 180s
14
VDE0126-DE
Germany power Grid, meet Grid standards “VDE 0126”.
15
CEI0-16
Italy power Grid, meet Grid standards “CEI 0-16”.
16
G98
UK power Grid.
17
Greece Island
Greece Island power Grid.
18
EN50549-CZ
Czech Republic power Grid, meet Grid standards
“EN50438Y2007-CZ”.
19
IEC61727-IN
India power Grid.
20
Korea
Korea power Grid.
21
EN50549-SW
Sweden power Grid.
22
China-W
China power Grid, Grid voltage range
:
160-290V
23
China-H
Grid frequency range
:
47-53HZ.
24
IEC61727-IN-W
China power Grid, meet standards” CQC”.
25
Brazil
India power Grid, meet Grid standards “IEC61727”.
Summary of Contents for BRE-I-5K
Page 1: ...1 User Manual BRE I 5K OLIPOWER ENERGY AUTOMATION TECHNOLOGY...
Page 28: ...28 1 ADD Interface ADD interface PINS definition...
Page 33: ...33...
Page 34: ...34...
Page 54: ...54 Reactive power setting After user log into the system Remote control Reactive power...
Page 55: ...55 Volt watt setting After user log into the system Remote control Australia...
Page 62: ...62...