11
1. Generated
solar
energy
2. Load
consumption
3. Self-use
from
battery
4. Grid
supply
power
when the battery capacity is
not enough
This mode applies the area that has electricity price between peak and valley. User
can use of-peak electricity to charge the battery.
The charging and discharging time can be set flexibly, and it also allows choosing
whether charge from the grid or not.
Work mode: Back up mode
Priority: battery>load>grid
1. Generated solar
energy
2. Storage in Battery
3. Load consumption
4. Grid supply power
Summary of Contents for BRE-I-5K
Page 1: ...1 User Manual BRE I 5K OLIPOWER ENERGY AUTOMATION TECHNOLOGY...
Page 28: ...28 1 ADD Interface ADD interface PINS definition...
Page 33: ...33...
Page 34: ...34...
Page 54: ...54 Reactive power setting After user log into the system Remote control Reactive power...
Page 55: ...55 Volt watt setting After user log into the system Remote control Australia...
Page 62: ...62...