
EN - 12
DOME
Installation and connections
DANGER
All operations described in this chapter
shall be carried out by skilled and author-
ized technicians, only.
3.1 - UNIT LIFTING (Fig. 1)
Lift the unit through a suitable device, such as a crane
or an hoist, complying with the following instructions:
• Unscrew the screws (1) and remove the top covering
that blocks the stones (2). (Fig.1)
• Remove the first stone (3) and do the same with
the other stones counterclockwise, until you have
removed them all. (Fig.2)
• Hook 4 ropes to the eyebolts (4) on the oven and the
orher end to the forks of the forklift adjusted according
to the weight of the oven.
• Lift the oven making sure it is balanced. (Fig. 3)
Chapter 3
FIG. 1
1
1
2
FIG. 2
3
Summary of Contents for DOME
Page 6: ...DOME Norme ed avvertenze generali IT 2...
Page 11: ...IT 7 DOME Trasporto e disimballo DIMENSIONI DI INGOMBRO Capitolo 2...
Page 38: ...DOME Manutenzione IT 34...
Page 46: ...DOME General specifications and warning EN 2...
Page 51: ...EN 7 DOME Transport and unpacking OVEN OVERALL DIMENSIONS Chapter 2...
Page 78: ...DOME Maintenance EN 34...
Page 86: ...DOME Normes et instructions g n rales FR 2...
Page 91: ...FR 7 DOME Transport et d semballage DIMENSIONS D ENCOMBREMENT FOUR Chapitre 2...
Page 118: ...FR 34 DOME Entretien...
Page 126: ...DOME Allgemeine Normen und Anmerkungen DE 2...
Page 131: ...DE 7 DOME Transport und Auspacken AUSSENABMESSUNGEN Abschnitt 2...
Page 158: ...DE 34 DOME Instandhaltung...
Page 166: ...DOME Normas y advertencias generales ES 2...
Page 171: ...ES 7 DOME Transporteydesembalaje DIMENSIONES DE VOLUMEN HORNO Cap tulo 2...
Page 198: ...ES 34 DOME Mantenimiento...
Page 205: ......