BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08.docx
Page 19 of 92
4.1.4 Expansion vessel
Figure 22:
Draining and filling detailed view
For larger system volumes, the expansion vessel has to be re-calculated. If the integral 24 l vessel is not
adequate, install an additional expansion vessel externally. See
EN 12828
4.1.5 Venting the system
Figure 23:
Indoor unit air vent valve
Water will escape when the safety valve is opened.
Route the plastic hose at the rear of the heat pump into the sewage drain. Ensure proper drainage. The
drain must not be permanently connected to the sewage drain! A funnel with a siphon must be provided.
NOTE
Drain and fill opening
Expansion vessel
NOTE
Air vent valve
CAUTION!
Close the valve cap after
venting.
Summary of Contents for AIR BASIC 109
Page 2: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 2 of 92...
Page 22: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 22 of 92...
Page 79: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 79 of 92...
Page 80: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 80 of 92...
Page 81: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 81 of 92...
Page 82: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 82 of 92 11 5 ERP Data...
Page 83: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 83 of 92...
Page 84: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 84 of 92...
Page 85: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 85 of 92...
Page 86: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 86 of 92...
Page 87: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 87 of 92...
Page 90: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 90 of 92...
Page 91: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 91 of 92...