4.2. 

INSTALLING THE LIGHT UNIT ON L-868 BASE, SIZE B 

 
Install L-868 light base in compliance with FAA AC 150/5340-30. 
The  fixture  is  shipped  complete  (including  the  lamps)  and  is  ready  for  installation  as 
received, except the dome outside O-Ring outside the dome separately supplied (Fig.1 – 
n°19). 
Be sure the flange on the transformer housing is clean and the O-Ring (if used) is in place 
in the O-Ring groove. 
Connect  the  plug  of  the  fixture  to  the  receptacle  of  the  isolating  transformer  inside  the 
deep  base.  Connect  the  grounding  wire  of  the  fixture  to  the  grounding  wire  of  the  deep 
base (faston connection). Then press the fixture firmly and evenly by hand onto the base 
flange.  Secure  the  fixture  to  the  base  by  using  the  six  locking  screws  complete  with 
washers,  supplied  with  the  base.  One  drop  of  anaerobic  adhesive,  medium  type  (e.g. 
Loctite  243)  should  be  applied  to  the  screws  before  installation;  tightening  torque  is  25 
Nm. 
The  fixture  is  subject  to  optical  misalignment  and/or  mechanical  damage  if  not  properly 
seated. 
 
 
4.3. 

SECONDARY WIRING 

 
The  IEC  61823 International Standard (AGL series transformers) states at para. 4.6 that 
“if  an  earthing  connection  is  provided,  it  shall  be  connected  to  the  larger  socket  of  the 
transformer secondary connector.”  
 
This means that, when a fixture is directly connected to the relevant isolation transformer 
(provided  with  earthing  connection),  the  fixture  secondary  side  is  wired  to  the  grounding 
network through the larger pin of fixture plug. 
 
In case of an inset fixture, installed in the taxiway/runway pavement on its shallow base far 
from  the  relevant  isolation  transformer,  it  is  necessary  to  provide  a  secondary  extension 
between  fixture  and  transformer.  To  help  the  installer  to  identify  the  larger  socket  of  the 
female  connector  inside  the  base  (when  installed),  the  base  secondary  cable  leads  are 
identified by a colour code: the grey wire is wired to the larger socket, the black wire to the 
other  one.  In  this  way  it  will  be  easy  to  assure  the  earthing  wiring,  above  described, 
between  the  larger  socket  of  the  transformer  secondary  connector  and  the  larger  pin  of 
the fixture plug. 
 
 
5. 

MAINTENANCE 

 
 

WARNING 

BEFORE  ANY  MAINTENANCE  INTERVENTION,  MAKE 
SURE THE POWER SUPPLY BE SWITCHED OFF. 

Summary of Contents for SLTH

Page 1: ...E AUTOMATIC KNOWLEDGE MANAGEMENT SYSTEM IT CAN BE SIGNED ON REQUEST THIS DOCUMENT AND THE DATA CONTAINED HERE IN IS PROPRIETARY PROPERTY AND SHALL NOT BE DUPLICATED USED OR DISCLOSED IN WHOLE OR IN PA...

Page 2: ...dition 02 09 2010 SLTH SEMI FLUSH THRESHOLD LIGHT INSTRUCTION MANUAL FOR USE INSTALLATION AND MAINTENANCE EDITION Data 02 09 2010 Emission 03 13 2012 Second Edition REVISIONS Index Date Description Wr...

Page 3: ...epaid by Purchaser to establish a claim under this warranty The cost of labour for the installation of a repaired or replaced Product shall be borne by Purchaser Replacement parts provided under the t...

Page 4: ...ystem and check for voltage presence before accessing REANIMATION The maintenance staff must be aware of the risks related to electricity criteria to prevent the risk of electric shock and resuscitati...

Page 5: ...RY WIRING 20 4 MAINTENANCE 20 4 1 REMOVING AND OPENING THE LIGHT UNIT FROM THE BASE 21 4 2 PRIMS CLEANING 21 4 2 1 Prism outside cleaning 21 4 2 2 Prism outside cleaning 21 4 3 PRISM REPLACEMENT 22 4...

Page 6: ...d Part List 9 Figure 2 Complete P N identification 10 Figure 3 Dome Outside view 11 Figure 4 Dome Inside view 11 Figure 5 Lower cover optional fuse cutout Inside view 12 Figure 6 Lower cover with opti...

Page 7: ...t through different positioning of the lamps In this way all lights result mechanically identical and the shallow base installation becomes very easy because no precise toe in is required during civil...

Page 8: ...er is provided with one threaded hole for cable entry and external grounding screw with yellow green cable lead size 2 5 mm 2 0 460 m long with male faston terminal A suitable valve is outside mounted...

Page 9: ...Vibration damping block 4 15 Spacer 4 16 HSCH M5x25 inox screw 4 17 5 inox grower washer 5 18 5x10x1 inox washer 7 19 O Ring 41150 silicone 1 20 O Ring 6850 silicone 1 21 Expanded PTFE strip 1 22 HSC...

Page 10: ...Basic P N Colour G Green A Green FAA Toe in RI Left LI Right ST Straight Lamps 200 2x105W 6 6A reflectorized Mounting Assembly B Standard Shallow Base 12 dia O No Mounting Assembly Options F Fuse Cut...

Page 11: ...nit fastening 3 Slot for dome removal 4 Painted area to identify the beam colour 5 Label with arrow for toe in identification Figure 3 Dome Outside view 1 Window to seat the prism 2 Through holes for...

Page 12: ...sulating strip cable 3 Insulating strips 4 Insulating strips fastening screws 5 Lamp supporting plate identification label 6 Leak test valve Figure 5 Lower cover optional fuse cutout Inside view 1 Cab...

Page 13: ...able entry The shallow base is designed for cementing in place by means of epoxy resin in a hole drilled in the pavement The fixture has to be fastened to the base by means of six hex cap screws compl...

Page 14: ...n the specified limits All surfaces of the recess must be clean and dry If any of these surfaces is damp it is desirable that it be dried and blown clean with a compressed air blast The recess side wa...

Page 15: ...15 of 28 Edition 03 13 2012 Supersedes edition 02 09 2010 SLTH SEMI FLUSH THRESHOLD LIGHT INSTRUCTION MANUAL FOR USE INSTALLATION AND MAINTENANCE Figure 8 Example of threshold configuration one trans...

Page 16: ...be laid in cable ducts fig 10 Proceed as follow to realize a proper installation A B 1 Unscrew the six locking screws and remove the fixture from the base using the lifting tool P N 332 4140 or 332 4...

Page 17: ...f sealer to the bottom of the drilled hole to assure a bond between the bottom of the light base and the drilled hole It may be necessary to place temporary plugs so as to block the wireways entrances...

Page 18: ...should be filled with sealer up to approx 25 mm from the pavement according to the local needs Fill the remaining 25 mm with a suitable joint sealing filler 11 Lay the secondary power cable equipped...

Page 19: ...NANCE 1 Positioning jig 2 Align the jig notch with the mark on the pavement 3 Circular level 4 Screws and spacers for the jig mounting 5 Lobe knob for positioning jig levelling 6 Shallow base notches...

Page 20: ...installation tightening torque is 25 Nm The fixture is subject to optical misalignment and or mechanical damage if not properly seated 4 3 SECONDARY WIRING The IEC 61823 International Standard AGL ser...

Page 21: ...screws HSCH M5x16 fig 1 n 22 If the lower cover assembly is hard to remove it is possible to use two of these screws in two threaded holes close to the locking holes Every time the fixture is removed...

Page 22: ...1 Removing the prism Remove the fixture from the base and open the fixture as described at paragraph 4 1 Clean out possible pieces of the old prism and all accumulated debris from the inside Remove t...

Page 23: ...fig 1 n 8 9 and fix it to the dome using the relevant screws BHC M5x10 fig 1 n 10 Inspect all components ins ide the fixture for damages or signs of corrosion Replace all necessary components Reassemb...

Page 24: ...et is dimensioned to allow the proper positioning when compressed between the mating surfaces Screws properly tightened are important in obtaining a complete seal TIGHTENING TORQUE lower cover HSCH M5...

Page 25: ...ctions of par 4 2 5 9 PRESSURE VALVE If a leakage is found through the pressure valve during an air pressure test check carefully where the leakage happens If the leakage is between the valve fig 5 6...

Page 26: ...dictated by the weather and the location of the fixtures 5 11 3 SNOWPLOW OPERATIONS Snowplow operators should exercise extra care not to strike the light fixtures with snowplow blades After snow remo...

Page 27: ...t once every three months or more frequently during the two four weeks following the reinstallation of a serviced fixture 5 11 6 LEAKAGE TEST If any fixture contains water remove the water and clean a...

Page 28: ...ten halogen 6 6 A with dichroic reflector 1 13 153 0040 Dichroic GREEN filter complete with holder for SLTH G 153 0070 Dichroic GREEN filter complete with holder for SLTH A 1 8 9 318 1130 Prism 1 3 32...

Reviews: