Document UT-MT-0573
Page 16 of 28
Edition 03/13/2012
Supersedes edition 02/09/2010
SLTH – SEMI-FLUSH THRESHOLD LIGHT
INSTRUCTION MANUAL FOR USE, INSTALLATION AND MAINTENANCE
Figure 9 – Sawcutting and joint intersection details
4.1.
INSTALLING THE SHALLOW BASE
Two different installations are possible:
Method “A” – cable leads to be laid in wireways
Method “B” – cable leads to be laid in cable ducts (fig.10)
Proceed as follow to realize a proper installation.
A
B
1
Unscrew the six locking screws and remove the fixture from the base
using the lifting tool P/N 332.4140 or 332.4230 (as alternative two
screwdrivers can be used).
2
To assure an adequate bond between base and hole all external
surfaces of the base should be sandblasted and must be cleaned with
solvent. TAKE CARE NOT TO DAMAGE THE ELECTRICAL SYSTEM.
3
/
Connect an insulated G/Y grounding wire of suitable length to the
grounding screw externally provided on the wall of the base.