nVent.com | 3
Do not cut
through metal braid
or inner jacket.
1
3
4
2
For pipe-mounted applications follow
steps 1 through 10 (pages 3–5).
For roof-mounted applications,
follow steps 2 through 9
(pages 3–5), then turn to “Roof
Installation” on page 6.
• Place kit on pipe and attach with
plastic cable ties.
• Score around and down the outer jacket of the heating
cable 3 1/8-inches from the end.
• Allow enough extra heating cable to make service loops
as required.
• Make sure the end of the heating cable is cut clean.
• Remove the outer jacket.
• Place the metal clip over the base of the exposed braid.
If you experience difficulty during installation, refer to the “Troubleshooting Guide” on page 8.
Splice, Tee, and Cross Installation