nVent.com | 5
Tighten the
screws until
the metal top
surface is at
the same
height as the
inner clear
plastic
module.
®
R
8
10
11B
9
11A
11C
• Securely tighten the two connection screws, alternating
as they are being tightened.
• Close the lid and snap the lever
shut. Do not force lid closed. If lid does
not close, check the connection to ensure
all screws are fully tightened.
• Tighten the nuts on the heating cable entries until
grommets are compressed.
• Repeat steps 2 through 7 for all
remaining heating cable entries.
• Using glass cloth tape,
attach heating cable to pipe.
• Apply insulation, cladding, warning
labels and yellow splice identification label.
• Using glass cloth tape,
attach heating cable to pipe.
• Apply insulation, cladding, warning
labels and yellow splice identification label.
• Using glass cloth tape,
attach heating cable to pipe.
• Apply insulation, cladding, warning
labels and yellow splice identification label.
WARNING: Fire hazard. Loose screws can cause
excessive heating. Be sure screws are fully tightened.
SPLICE
TEE
(insulation not shown)
CROSS
(insulation not shown)