Operating Instruction and Documentation
Jumbo NT 3500
- 39
-
Table to pic. 11
Liebig-dowels
Dowel-type
BM10-15/70/65 BM10-15/70/100
BM10-15/70/140
Drilling
depth a
85
85
85
Min. anchorage depth
b
70
70
70
Thickness of concrete
c
min.140(*)
min.140
(*) min.140
(*)
Diameter
of
bore d
15
15
15
Thickness of the lift-pieces
e+f
40-65
65-100
100-140
Quality
of
concrete
min.C20/25
normal
armouring
Number
of
dowels
12
12
12
Starting torque
40
Nm
40Nm
40Nm
(*) minimum thickness of concrete by using the mentioned dowels. Otherwise,
observe the regulation of the foundation plan.
You can use equivalent dowels from another dowel manufacturer (with license) but
observe their regulation.
First security check before installation
Filling out and leave in this manual serial-no.:___________________
all
defect
veri-
kind
of
check
right missing
fication
remark
-------------------------------------------------------------------------------------------------------------------------------------------------------------------
Type plate.....................................................
F
F
F
..................................................
Short operating instruction.................................
F
F
F
..................................................
Warning designation..........................................
F
F
F
..................................................
Designation lifting/lowering.............................
F
F
F
..................................................
Detailed operating instruction...........................
F
F
F
..................................................
Main switch lockable........................................
F
F
F
..................................................
Condition/Function foot protection...................
F
F
F
..................................................
Function button “Lifting/Lowering”.................
F
F
F
..................................................
Condition/Function Ramps...............................
F
F
F
..................................................
Condition automotive lift..................................
F
F
F
..................................................
Securing of bolts...............................................
F
F
F
..................................................
Condition bolts and bearings............................
F
F
F
..................................................
Construction (deformation,cracking) ................
F
F
F
..................................................
torque moments of the screws and dowels .....
F
F
F
..................................................
Fixed seat of the screws....................................
F
F
F
..................................................
Condition welding.............................................
F
F
F
..................................................
Condition operating unit...................................
F
F
F
..................................................
Condition surface piston rod
........................
F
F
F
..................................................
Condition coverings...........................................
F
F
F
..................................................
Condition electrical wires
.............................
F
F
F
..................................................
Level of hydraulic oil
...................................
F
F
F
..................................................
Condition of the hydraulic system.....................
F
F
F
..................................................
Condition hydraulic hoses.................................
F
F
F
..................................................
Function test with vehicle..................................
F
F
F
..................................................
Function CE-Stop (optional).............................
F
F
F
..................................................
Function equalization of the lift........................
F
F
F
..................................................
Condition polymer-supports.............................
F
F
F
..................................................
( mark here applicable, in case of verification mark in addition to the first mark!)
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Security check carried out:.......................................................................................................................
Carried out the company:......................………….....................................................................................
Name, address of the competent:..............................…………................................................................
Summary of Contents for JUMBO NT 3500
Page 9: ...Operating Instruction and Documentation Jumbo NT 3500 9 2 5 Attestation of conformity...
Page 11: ...Operating Instruction and Documentation Jumbo NT 3500 11 3 3 Datasheet...
Page 12: ...Operating Instruction and Documentation Jumbo NT 3500 12 3 4 Foundation plan...
Page 13: ...Operating Instruction and Documentation Jumbo NT 3500 13...
Page 14: ...Operating Instruction and Documentation Jumbo NT 3500 14 3 5 Dowel Positions...
Page 17: ...Operating Instruction and Documentation Jumbo NT 3500 17 3 8 Electrical diagram drawing...
Page 18: ...Operating Instruction and Documentation Jumbo NT 3500 18...
Page 19: ...Operating Instruction and Documentation Jumbo NT 3500 19...
Page 20: ...Operating Instruction and Documentation Jumbo NT 3500 20...
Page 21: ...Operating Instruction and Documentation Jumbo NT 3500 21...