Operating Instruction and Documentation
2.60 HL SST
- 26 -
8. Security check
The security check is necessary to guarantee the safety of the lift during use. It has to be
performed in the following cases:
1. Before the initial operation, after the first installation.
Use the form “First security check before initiation”
2. In regular intervals after the initial operation, at least annually.
Use the form “Regular security check at least annually”
3. Every time the construction of that particular lift has been changed.
Use the form “Extraordinary security check”
The first and the regular security check must be performed by a competent person. It
is also recommended to carry out a service on the lift at this time.
After the construction of the lift has been changed (changing the lifting height or
capacity for example) and after serious maintenance works (welding load bearing
parts) an extraordinary security check must be performed by an expert.
This manual contains forms with a schedule for the security checks. Please us the appropriate
forms for the security checks. The forms should remain in this manual after they have been filled
out. A short description about special safety devices follows.
9. Handing over and Initiation
9.1 Regulations
• The installation of the lift is performed by trained technicians of the manufacturer or one of its
distribution partners. If the operator can provide trained mechanics, he or she can install the
lift by him or herself. The installation has to be done according to this regulation.
• Installing the standard-automotive lift in a hazardous location or a washing bay is not
allowed..
• Before installation a sufficient foundation must be constructed. If the foundation is already
constructed then proof that the foundation conforms to the standard is required.
A level foundation for the installation is required. The foundations must be based in a frost
resistance depth, both outdoors and indoors in a position where the installer believes there is
no chance of frost.
• An electrical supply 3~/N+PE, 400 V, 50 Hz must be provided.
The supply line must be protected with a time-lag fuse T16A (VDE0100 German regulation).
The minimum diameter amounts to 2.5 mm².
• All cable ducts must be equipped with protective coverings to prevent accidents.
Summary of Contents for 2.60 HL SST
Page 9: ...Operating Instruction and Documentation 2 60 HL SST 9 2 5 Declaration of confomity...
Page 11: ...Operating Instruction and Documentation 2 60 HL SST 11 3 3 Data sheet...
Page 12: ...Operating Instruction and Documentation 2 60 HL SST 12...
Page 13: ...Operating Instruction and Documentation 2 60 HL SST 13...
Page 14: ...Operating Instruction and Documentation 2 60 HL SST 14...
Page 44: ...Operating Instruction and Documentation 2 60 HL SST 44 Hydraulic diagram drawing...
Page 46: ...Operating Instruction and Documentation 2 60 HL SST 46 Electrical diagram drawing...
Page 47: ...Operating Instruction and Documentation 2 60 HL SST 47...
Page 48: ...Operating Instruction and Documentation 2 60 HL SST 48...
Page 49: ...Operating Instruction and Documentation 2 60 HL SST 49...
Page 50: ...Operating Instruction and Documentation 2 60 HL SST 50...
Page 51: ...Operating Instruction and Documentation 2 60 HL SST 51...
Page 52: ...Operating Instruction and Documentation 2 60 HL SST 52...
Page 53: ...Operating Instruction and Documentation 2 60 HL SST 53...
Page 54: ...Operating Instruction and Documentation 2 60 HL SST 54...
Page 55: ...Operating Instruction and Documentation 2 60 HL SST 55...
Page 56: ...Operating Instruction and Documentation 2 60 HL SST 56...
Page 57: ...Operating Instruction and Documentation 2 60 HL SST 57...
Page 58: ...Operating Instruction and Documentation 2 60 HL SST 58...