Operating Instruction and Documentation
2.60 HL SST
- 24 -
Use a ATF-Suffix hydraulic-oil (OEST Company ) if the ambient
temperature is under 5 degree centigrade. After the fill up, the hydraulic
oil must be between the upper and low marking of the oil level gauge.
Check all welded joints for cracks on the automotive-lift.
If any cracks are found on the lift cease use immediately. Switch-off
and secure the main switch (lock) and call the service partner
.
min. 1x yearly
Damage to external surfaces, must be immediately repaired.
If theses repairs are not made immediately, permanent damage to the
powder-coated surface may result.
Repair and clean damaged areas with an abrasive paper (grain 120).
After this is complete, use a suitable paint (observe the RAL Number).
min. 1x yearly
Check the zinc surface and repair it with a suitable tool. Use abrasive
paper (grain 280).
White rust can result from moisture laying in certain areas for long
periods of time. Poor aerating can also result in rust formation.
Rust may result from mechanical damage, wear, aggressive sediments
(de-icing salt, liquids) or insufficient cleaning.
Repair and clean these areas with abrasive paper (grain 280).
After this is complete, use a suitable paint (observe the RAL Number).
min. 1x yearly
Check the condition and function of the safety device CE-Stop and the
acoustic signal, foot protection, locking system of the lifting arms,
rubber pads
daily
Check the Battery of the controller (ASC). The Battery has a working
life at normal business between 4 ½ - 5 Years (manufacturers
statement). To avoid a permanent data-loss through an empty battery,
you must examine the battery of the controller during the regularly
maintenance. The measuring can only take place at the controller
which was switched-off. The measuring is possible with a commercial
tensiometer. Standard voltage approx. 3.2 V (no exchange necessary),
but a value under 2.9 V, the controller must be exchanged. Send the
controller to the Nußbaum Headquarter.
Previously, contact your service partner.
min. 1x yearly
Check the electrical cable, plugs for damages
min. 1x yearly
Check the condition and function of the electrical box, press button,
signal lamps and labelling.
min. 1x yearly
Check the condition of the cable channels.
min. 1x yearly
Check the condition of the concrete floor at the dowels.
min. 1x yearly
Check the turning moment of the screws (see the list)
min. 1x yearly
Summary of Contents for 2.60 HL SST
Page 9: ...Operating Instruction and Documentation 2 60 HL SST 9 2 5 Declaration of confomity...
Page 11: ...Operating Instruction and Documentation 2 60 HL SST 11 3 3 Data sheet...
Page 12: ...Operating Instruction and Documentation 2 60 HL SST 12...
Page 13: ...Operating Instruction and Documentation 2 60 HL SST 13...
Page 14: ...Operating Instruction and Documentation 2 60 HL SST 14...
Page 44: ...Operating Instruction and Documentation 2 60 HL SST 44 Hydraulic diagram drawing...
Page 46: ...Operating Instruction and Documentation 2 60 HL SST 46 Electrical diagram drawing...
Page 47: ...Operating Instruction and Documentation 2 60 HL SST 47...
Page 48: ...Operating Instruction and Documentation 2 60 HL SST 48...
Page 49: ...Operating Instruction and Documentation 2 60 HL SST 49...
Page 50: ...Operating Instruction and Documentation 2 60 HL SST 50...
Page 51: ...Operating Instruction and Documentation 2 60 HL SST 51...
Page 52: ...Operating Instruction and Documentation 2 60 HL SST 52...
Page 53: ...Operating Instruction and Documentation 2 60 HL SST 53...
Page 54: ...Operating Instruction and Documentation 2 60 HL SST 54...
Page 55: ...Operating Instruction and Documentation 2 60 HL SST 55...
Page 56: ...Operating Instruction and Documentation 2 60 HL SST 56...
Page 57: ...Operating Instruction and Documentation 2 60 HL SST 57...
Page 58: ...Operating Instruction and Documentation 2 60 HL SST 58...