Operating Instruction and Documentation
2.60 HL SST
- 30 -
Masonry-Bolt length with floor pavement or tile surface
Liebig-bolts
bolt-type
BM16-25/100/65 BM16-25/100/100
Drilling
depth a
125 125
Min.
anchorage
depth
b
100 100
Thickness
of
concrete
c
min.250*
min.250*
Diameter
of
bore d
25
25
Thickness
of
the
lift-pieces e+f 40-65
65-100
Number of bolts
20
20
Starting torque
115Nm
115Nm
You can use equivalent dowels from another dowel manufacturer (with license) but
observe their regulation.
Summary of Contents for 2.60 HL SST
Page 9: ...Operating Instruction and Documentation 2 60 HL SST 9 2 5 Declaration of confomity...
Page 11: ...Operating Instruction and Documentation 2 60 HL SST 11 3 3 Data sheet...
Page 12: ...Operating Instruction and Documentation 2 60 HL SST 12...
Page 13: ...Operating Instruction and Documentation 2 60 HL SST 13...
Page 14: ...Operating Instruction and Documentation 2 60 HL SST 14...
Page 44: ...Operating Instruction and Documentation 2 60 HL SST 44 Hydraulic diagram drawing...
Page 46: ...Operating Instruction and Documentation 2 60 HL SST 46 Electrical diagram drawing...
Page 47: ...Operating Instruction and Documentation 2 60 HL SST 47...
Page 48: ...Operating Instruction and Documentation 2 60 HL SST 48...
Page 49: ...Operating Instruction and Documentation 2 60 HL SST 49...
Page 50: ...Operating Instruction and Documentation 2 60 HL SST 50...
Page 51: ...Operating Instruction and Documentation 2 60 HL SST 51...
Page 52: ...Operating Instruction and Documentation 2 60 HL SST 52...
Page 53: ...Operating Instruction and Documentation 2 60 HL SST 53...
Page 54: ...Operating Instruction and Documentation 2 60 HL SST 54...
Page 55: ...Operating Instruction and Documentation 2 60 HL SST 55...
Page 56: ...Operating Instruction and Documentation 2 60 HL SST 56...
Page 57: ...Operating Instruction and Documentation 2 60 HL SST 57...
Page 58: ...Operating Instruction and Documentation 2 60 HL SST 58...