![Novametrix Medical Systems OXYPLETH 520A Service Manual Download Page 64](http://html1.mh-extra.com/html/novametrix-medical-systems/oxypleth-520a/oxypleth-520a_service-manual_1710839064.webp)
Section 12
Functional Test
54
Model 520A Service Manual
5693-90-01
PRELIMINARY
normal power up sequence. Note that the system date and time are not af-
fected by this action.
Softkey #1
= EPROM Checksum Test, Production Test Mode
Turn the monitor on while holding
Softkey
#1
(the leftmost softkey) and
the monitor calculates and displays the checksum value of the EPROM
containing the system software. Press and hold
Softkey #3
while the
checksum is displayed and the monitor enters Production Test Mode.
Softkey #2
=Extended Display and Watchdog Test
Turn the monitor on while holding
Softkey
#2
(second from left) and all
front panel indicators and display segments illuminate for several sec-
onds. The watchdog now resets the monitor which should then execute its
normal power up sequence. Note that the
indicator will illuminate only
if the monitor is being powered from the AC Mains.
Figure 12.
Softkey Identification
Softkey #1
Softkey #2
Summary of Contents for OXYPLETH 520A
Page 10: ...Section List of Tables ix Model 520A Service Manual 5693 90 01 PRELIMINARY...
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......