![Nortel BCM50 Installation And Maintenance Manual Download Page 121](http://html.mh-extra.com/html/nortel/bcm50/bcm50_installation-and-maintenance-manual_1706243121.webp)
Chapter 11 Installing the analog terminal adapter
121
BCM50 Installation and Maintenance Guide
•
Use RECEIVE/600 OHM/HOLD mode on the test set
3
Ensure that the test set connects in parallel to the service line before removing the analog
telephone or the line drops.
4
Remove the single-line telephone.
5
Measure the 1 kHz tone at the far end of the analog port, which is where the analog loop ends
and where the analog device connects.
To measure the insertion loss from the analog device to the CO
1
Establish a connection to a silent termination on the CO service line with an analog telephone
attached to the ATA2.
2
Make sure the analog port terminates correctly in 600 ohms by:
•
Replace the analog telephone with the test set
•
Use TRANSMIT/600 OHM/HOLD mode on the test set
3
Make sure the test set connects in parallel to the service line before removing the analog
telephone or the line drops.
4
Remove the analog telephone.
5
Introduce a 1 kHz tone into the analog line at - 10 dBm, and measure the level at the CO
exchange.
Configuring the ATA2
Configure the ATA2 using Element Manager or Telset Administration. For detailed configuration
information, refer to the
BCM50 Device Configuration Guide (N0027146)
.
Note:
The tone must be greater than - 10 dB (for example: - 9 dB is acceptable).
Note:
The difference in levels is the transmit loss and must be less than 10 dB
(for example, 9 dB is acceptable).
Summary of Contents for BCM50
Page 1: ...Part No N0027152 01 08 April 2005 BCM50 Installation and Maintenance Guide ...
Page 8: ...8 Task List N0027152 01 N0027152 01 ...
Page 16: ...16 Contents N0027152 01 N0027152 01 ...
Page 34: ...34 Chapter 1 Getting started with BCM50 N0027152 01 N0027152 01 ...
Page 58: ...58 Chapter 2 Introducing the BCM50 hardware N0027152 01 N0027152 01 ...
Page 70: ...70 Chapter 4 Determining DHCP server configuration and IP address N0027152 01 N0027152 01 ...
Page 74: ...74 Chapter 5 Installing the BCM50 system N0027152 01 N0027152 01 ...
Page 96: ...96 Chapter 8 Installing an expansion unit N0027152 01 N0027152 01 ...
Page 116: ...116 Chapter 10 Installing telephones and peripherals N0027152 01 N0027152 01 ...
Page 122: ...122 Chapter 11 Installing the analog terminal adapter N0027152 01 N0027152 01 ...
Page 126: ...126 Chapter 12 Configuring the BCM50 system N0027152 01 N0027152 01 ...
Page 148: ...148 Chapter 15 Using the Startup Profile to configure parameters N0027152 01 N0027152 01 ...
Page 158: ...158 Chapter 17 Connecting the BCM50 system to the LAN and WAN N0027152 01 N0027152 01 ...
Page 168: ...168 Chapter 19 Replacing the BCM50 system components N0027152 01 N0027152 01 ...
Page 172: ...172 Chapter 20 Replacing a power supply N0027152 01 N0027152 01 ...
Page 178: ...178 Chapter 21 Replacing a main unit N0027152 01 N0027152 01 ...
Page 182: ...182 Chapter 22 Replacing a media bay module N0027152 01 N0027152 01 ...
Page 214: ...214 Appendix E DTM wiring chart N0027152 01 N0027152 01 ...
Page 220: ...220 Appendix G GATM wiring chart N0027152 01 N0027152 01 ...
Page 224: ...224 Appendix H 4x16 wiring charts N0027152 01 N0027152 01 ...
Page 240: ...240 Appendix K System region attributes N0027152 01 N0027152 01 ...
Page 246: ...246 Index N0027152 01 N0027152 01 ...