Repair
6-4
Part 107016-02
E
2016 Nordson Corporation
Resistor Replacement
See Figure 6-3.
1. Perform steps 1 through 4 of the
Powder Path Repair
procedure.
2. Unscrew the old resistor probe (2) from the multiplier (4). Clean the
exposed threads in the end of the multiplier and wipe the multiplier
well (5) with a clean cloth.
WARNING:
All air must be replaced by dielectric grease in the multiplier
well, resistor holder, and contact tip. High voltage can arc through air
pockets, burn through the multiplier or resistor probe, and create a fire or
explosion hazard.
3. Inject dielectric grease into the multiplier well (5) until it is completely full.
Use the applicator shipped with the resistor kit.
4. Fill the new resistor spring (3) and resistor probe cavity (6) completely
with dielectric grease.
5. Unscrew the new contact tip (1) from the resistor probe.
6. Screw the new resistor probe onto the multiplier and tighten it securely.
7. Apply dielectric grease to the threads of the new contact tip and into the
end of the probe.
8. Screw the contact tip into the resistor probe end and tighten it securely.
Do not overtighten. Wipe the excess dielectric grease off the contact tip,
resistor probe, and multiplier.
9. Install the wear sleeve over the resistor probe. Install the powder inlet
body, nozzle, and hose adapter.
1400420B
1
2
3
4
5
6
Figure 6-3
Resistor and Contact Tip Replacement
1. Contact tip
2. Resistor probe
3. Resistor spring
4. Multiplier
5. Multiplier well
6. Resistor probe cavity
Note:
Clean and grease items 1, 3, 5, and 6.
Summary of Contents for Versa-Spray II
Page 4: ...Change Record ii Part 107016 02 E 2016 Nordson Corporation...
Page 16: ...Installation 3 4 Part 107016 02 E 2016 Nordson Corporation...
Page 28: ...Troubleshooting 5 8 Part 107016 02 E 2016 Nordson Corporation...
Page 42: ...Parts 7 8 Part 107016 02 E 2016 Nordson Corporation...
Page 56: ...Options 8 14 Part 107016 02 E 2016 Nordson Corporation...