Instructions Manual
41
4. Preparation
LIFTING TUBE
OUTLET CHUTE
ENGLISH
7.
Fasten the hoses at the 4 points of the
outlet chute, using the fasteners (L), the
nuts and washers (M);
8.
Mount the two tensioners (T), fixing them
at the outlet chute with the bolts, washers
and nuts (S);
9.
Using a crane, lift the chute and position
it on the outlet chute;
10.
Place the pin (X), fit the two tensioners (T)
and place the two locks (V);
11.
Secure the tensioner to the chute with the
1
2
3
4
M
= Flat washer M8 (08 pcs)
M
= Lock nut M8 (08 pcs)
M
T
T
T
X
T
V
L
S
S
= Hex nut M12 x 40 mm (02 pcs)
S
= Flat washer M12 (02 pcs)
S
= Lock nut M12 (02 pcs)
V
Summary of Contents for FTN-1900
Page 2: ......
Page 3: ...FTN 1900 COSECHADORA DE FORRAJE ESPAÑOL ...
Page 4: ...ESPAÑOL ...
Page 133: ...Manual de Instrucciones 133 9 Especificaciones ESPAÑOL 9 4 Tabla de medidas de llaves ...
Page 136: ...136 Manual de Instrucciones 9 Especificaciones ESQUEMA HIDRAULICO ...
Page 138: ...138 Manual de Instrucciones ...
Page 139: ...Manual de Instrucciones 139 ESPAÑOL ...
Page 140: ...140 Manual de Instrucciones ...
Page 141: ...FTN 1900 FORAGE HARVESTER ENGLISH ...
Page 142: ...ENGLISH ...
Page 270: ...130 Instructions Manual 9 Specifications 9 3 Bolt torque table Torque unit N m ...
Page 271: ...Instructions Manual 131 9 Specifications ENGLISH 9 4 Gauge keys table ...
Page 274: ...134 Instructions Manual 9 Specifications HYDRAULIC SCHEME ...
Page 276: ...136 Instructions Manual ...
Page 277: ...Instructions Manual 137 ENGLISH ...
Page 278: ...138 Instructions Manual ...
Page 279: ......