10
INSTALLATION: Removing Carriage Fixing Screw and Packing
3)
Pull the packing in the processing chamber for-
ward to remove it.
4
Turn on
the power switch to remove
the packing cushioning the chuck shaft.
1)
Connect the power cord to the power inlet.
2)
Turn on
the power switch.
3)
Turning on the power switch automatically starts
initialization. After the chuck shaft is opened,
remove the packing.
Packing in the processing chamber
Power cord
Power inlet
Power switch
Packing