4. Install the quick coupling
Press the quick coupling straight into solar panel 1.
NOTE
The O-rings in the quick coupling have already been
treated with special high temperature grease. No
further lubrication is needed.
Further lubrication can reduce the service life and
invalidate the warranty!
ߒ
ߑ
5. Mount solar panel 2
The bottom rail's free locking clamp for the next stand must
be moved to the corresponding position for installation of the
second solar panel. Then position the solar panel on the locking
clamps, secure from behind and press in the quick coupling
(1). Connect the next stand to the solar panel (2). Assemble
the locking clamp with M10 x 25- screw, washer and M10-nut.
NOTE
Check that the quick couplings are correctly located
when the solar panels are connected. They must not
be crooked!
Check the distance between the solar panels (24
mm)!
55
Chapter 4 |
Mounting
SOLAR FP215 P/PL