Framing Dimensions
The following section describes the require-
ments for framing for the model 1060 Series
Note: Framing should be constructed as
required by local building codes.
When installing the unit consider the following:
Consider room traffic.
Insure there is plenty of ventilation.
Do not obstruct air supply vents.
NOTE:
All design dimensions and
specifications are subject to
approval on acceptance of
signed quote.
Mantel clearances
Figure 2
Figure
Figure 4
Combustible
Surface
Summary of Contents for 1060 Series
Page 13: ...Series 1060 13 ELECTRICAL CONNECTIONS Figure 9 Figure 10 Figure 11 ...
Page 15: ...Series 1060 15 ELECTRICAL CONNECTIONS Figure 15 ...
Page 19: ...Series 1060 19 VALVE INCLUDED IN THE 1060 SERIES HONEYWELL SV950 SYSTEM Figure 19 ...
Page 21: ...Series 1060 21 REMOTE CONTROL SETUP AND OPERATION SIT SYSTEM future option ...
Page 23: ...Series 1060 23 REMOTE CONTROL SETUP AND OPERATION SIT SYSTEM cont ...
Page 24: ...Series 1060 24 REMOTE CONTROL SETUP AND OPERATION SIT SYSTEM cont ...
Page 25: ...Series 1060 25 REMOTE CONTROL SETUP AND OPERATION SIT SYSTEM cont ...
Page 26: ...Series 1060 26 REMOTE CONTROL SETUP AND OPERATION SIT SYSTEM cont ...
Page 27: ...Series 1060 27 REMOTE CONTROL SETUP AND OPERATION SIT SYSTEM cont ...
Page 43: ...Series 1060 43 NOTES ...
Page 44: ...Series 1060 44 NOTES ...