19
3.2.1. Detailed assembly procedure
1
Attaching the power cord and startup of the device
IV
III
I
II
A
Illustration 004: Connecting the power cord and commissioning.
Connect the cold-device plug (I) to the ap-
propriate mains in (II) on the back of the mi-
croscope.
Insert the main power plug (III) into the pow-
er socket (IV).
V
B
Move On/Off switch (V) to position I to turn
on the device on the left side of the micro-
scope.
DESIGN OF NE620T
3
Make sure the supplied voltage matches the instruments specifications: 100-240 V,
50/60 Hz.
Make sure that the main switch is set to O (OFF) before connecting the power cord.
To avoid electric shock, connect the cold-device plug to a properly grounded pow-
er socket. These cold-device plug has three-pin plugs to ensure proper grounding.
Cables and cords are vulnerable when bent or twisted. Never subject them to
excessive force.
Summary of Contents for NE620T
Page 60: ...60 9 NOTES COMMENTS 9 NOTES COMMENTS ...
Page 61: ...61 NOTES COMMENTS 9 ...
Page 62: ...62 9 NOTES COMMENTS 9 NOTES COMMENTS ...
Page 63: ...63 NOTES COMMENTS 9 ...