![New Leader NL4500G4 Operator'S Manual Download Page 38](http://html1.mh-extra.com/html/new-leader/nl4500g4/nl4500g4_operators-manual_1677967038.webp)
- 38 -
www.New-Leader.com
(800) 363-1771
313974-AA-B
NL4500G4 TRIDENT
Header
Insert Installation
ELECTRICAL CONNECTIONS
Connect all electrical control circuits. All wiring should be approved automotive insulated wire, supported
adequately with insulating ties or straps, and located where it will not interfere with any control or access.
Make sure wiring does not contact any moving parts or sharp edges and is kept away from hydraulic lines
and heated parts.
Plug in Encoder.
Refer to “Controller” parts pages for illustrations of master/slave control modules.
Locate the gray insert bin detection receptacle and the black lanyard receptacle hanging in-line on ISOBUS
harness, near the 35 pin chassis connector.
When an insert bin is installed, the gray detection loop plug must be installed in the gray insert detection
receptacle. Install the black plug into the black lanyard receptacle for storage.
MICRO COVER INSTALLATION
Air Supply and Electrical Requirements
Auxiliary Supply Line
Electrical Connections
Dry Air - 85 PSIG (5.86 Bar)
Red = 12 V (+)
Black = Ground (-)
Refer to “MultiBin Lid Pneumatics” in the spreader parts manual for air line connections.
Make sure all hardware on insert is torqued before installing cover.
WARNING
Pressurized air may cause sudden movement of parts. Do not service cover
components until safety precautions have been performed.
Take preventative measures to prevent falling or runaway of cylinder or mechanism
before maintenance and restart of spreader.
Exhaust all residual air and cut the pressure supply for components before servicing.
Injury can occur if precautions are not taken.
WARNING
Open cover lid with air prior to removing actuator pin and block cover lid to prevent
closing. Unintentional closing could cause injury.
Fasten a three-point li ing device to two li hooks and one hole in guide mount as shown in Figure 20. Hoist cover
onto M
B as shown in Figure 21. Align slots and a ach hardware. Tighten to recommended torque. Secure
fi ngs and airline tubing on M
B with wire es as shown in Figure 22. Connect to air and electrical systems.
Open lid and install addi onal hardware inside cover. Install screens.
Refer to “Air Schematic” page in the
Troubleshooting
section for air supply requirements.