![New Leader NL4500G4 Operator'S Manual Download Page 105](http://html1.mh-extra.com/html/new-leader/nl4500g4/nl4500g4_operators-manual_1677967105.webp)
- 105 -
NL4500G4 TRIDENT
www.New-Leader.com
(800) 363-1771
313974-AA-B
Header
Spinner Assembly Calibration
The spinner assembly must be calibrated if either the
fore/aft or left right cylinders are replaced, or if a new
swath module is installed.
• Press
to calibrate spinner assembly.
WARNING
Spinner assembly will move during
calibration process. Keep away from
moving parts to avoid injury.
• Press to begin calibration process.
• Spinner assembly will move through range of
motion both fore/aft and left/right. Press
when complete.
Controller Operations