![New Leader NL4500G4 Operator'S Manual Download Page 113](http://html1.mh-extra.com/html/new-leader/nl4500g4/nl4500g4_operators-manual_1677967113.webp)
- 113 -
NL4500G4 TRIDENT
www.New-Leader.com
(800) 363-1771
313974-AA-B
Header
3. Verify task control in Target Rate 1.
• Rate will be driven by job setup in display. To verify
this, TC should show in place of target rate 1. If
not, verify job has been created correctly. Refer to
display manual.
4. Verify total spread width and spinner speed:
• Different products may require different spread
widths or spinner speeds. Always verify the
material pro
fi
le is con
fi
gured correctly before
applying product.
• Edit current pro
fi
le or create a new one if
necessary. See “Material Pro
fi
le Management” for
details.
• Enable Spinner Circuit. Using keypads, enter
Spinner Speed and Total Spread Width. If desired,
enter Spinner Offset (see
Boundary Spreading
section of this manual for instructions).
5. Verify gate opening:
• Press
to set bin levels and
change gate opening.
Controller Operations