- 39 -
L5034G4
www.NewLeader.com
(800) 363-1771
305438-J
General Operating Procedures
1� Make sure unit has been properly serviced and is in good operating condition� It is highly recommended
to run the spreader prior to loading material to ensure acceptable operation�
2� Program controller with correct data for material(s) and application�
3� Adjust feedgate to appropriate setting�
4� Adjust spinner to give spread pattern desired� Calibrate and spread pattern test for any new material�
5� Fill applicable bins with material to be spread�
6� Engage hydraulics�
7� Begin spreading�
Drive only at speeds which permit secure control of vehicle! Failure to follow this requirement
may result in injury or machine damage�
Change hydraulic oil filter after first week (or not more than 50 hours) of operation on a unit.
*Visit
newleader�highwayequipment�com/calculators/yield-output
for interactive tools to calculate yield,
proper feedgate opening, conveyor revolutions per minute and mph to maximize the performance of your
spreader�
Summary of Contents for L5034 G4
Page 6: ...Insert Current New Leader Warranty Warranty...
Page 7: ...SAFETY...
Page 26: ...INSTALLATION...
Page 35: ...33 This page is intentionally left blank L5034G4 www NewLeader com 800 363 1771 305438 J Notes...
Page 36: ...34 This page is intentionally left blank www NewLeader com 800 363 1771 305438 J L5034G4 Notes...
Page 37: ...OPERATIONS MAINTENANCE...
Page 50: ...47 L5034G4 www NewLeader com 800 363 1771 305438 J Troubleshooting Hydraulic Schematic...
Page 54: ...CONTROLLER...
Page 91: ...SPREAD PATTERN...
Page 102: ...PARTS...
Page 114: ...108 www NewLeader com 800 363 1771 305438 J L5034G4 Main Bin Body Hydraulics...
Page 115: ...109 L5034G4 www NewLeader com 800 363 1771 305438 J Main Bin Cont Body Hydraulics...