5 - TRANSPORT OPERATIONS
Preparing for road transport
Tie downs for shipping
1.
Set the machine in the position for transport: fully
retract the arm and curl the bucket slowly.
2.
Lower the dozer blade.
3.
Check the overall height between the ground and the
highest point of the machine and check the overall
width of the machine. Make sure to be within the size
limits defined on the documents and permissions of
the local traffic regulations.
4.
Set the safety lever to rearward position (LOCK po-
sition)
5.
Turn off the engine and remove the starter key.
6.
Get off the machine.
7.
Use the starter key to close and secure the cab door,
the engine access door, the tool box, and the service
door.
8.
Check the condition of the tie-down points on the
trailer.
9.
Secure the machine onto the trailer using wire ropes
(A)
to prevent the machine from swaying (oscillation)
during transport.
SMIL16MEX0407AB
1
10. Carry out a final check of the tie-down condition.
11. If a rear loading type trailer is used for road transport,
lift or remove the loading ramps.
12. Remove blocks from the tires of the trailer.
5-3
Summary of Contents for E26C
Page 56: ...2 SAFETY INFORMATION 2 36 ...
Page 68: ...3 CONTROLS AND INSTRUMENTS Footrest SMIL19MEX0775BA 17 3 12 ...
Page 106: ...3 CONTROLS AND INSTRUMENTS 3 50 ...
Page 142: ...5 TRANSPORT OPERATIONS 5 8 ...
Page 218: ...6 MAINTENANCE 6 76 ...
Page 222: ...7 TROUBLESHOOTING 7 4 ...