4 - OPERATING INSTRUCTIONS
Digging and loading operations
Set the tracks parallel to the line of the ditch to be excavated when digging a ditch. Do not swing while digging.
1. Do the digging work by arm.
Use the pulling force of arm for digging and use together
with the digging force of the bucket if necessary.
SMIL16MEX1540AB
3
2. The digging resistance and wearing of tooth can be
reduced by putting the end of bucket tooth to the digging
direction.
SMIL16MEX1541AB
4
3. Do not use the dropping force of the work equipment
for digging.
NOTICE:
the machine can be damaged by the impact.
SMIL16MEX1542AA
5
4. Do not use the bucket to crack hard objects like con-
crete or rocks.
NOTICE:
this may break a tooth or pin, or bend boom.
SMIL16MEX1543AA
6
4-10
Summary of Contents for E26C
Page 56: ...2 SAFETY INFORMATION 2 36 ...
Page 68: ...3 CONTROLS AND INSTRUMENTS Footrest SMIL19MEX0775BA 17 3 12 ...
Page 106: ...3 CONTROLS AND INSTRUMENTS 3 50 ...
Page 142: ...5 TRANSPORT OPERATIONS 5 8 ...
Page 218: ...6 MAINTENANCE 6 76 ...
Page 222: ...7 TROUBLESHOOTING 7 4 ...