3.7
DISSOLVED OXYGEN PROBE CALIBRATION
Probe is to be calibrated after autoclaving vessel.
1.
There are two methods of obtaining zero on DO.
METHOD 1 (Less Accurate)
Remove the DO probe cable from the DO probe. Set the selector switch to
"DO".
Set the mode switch to "ZERO". With the INC/DEC switch adjust the display
reading on the DO to read zero. Connect the DO probe cable to the probe.
METHOD 2
Connect the DO probe cable to the DO probe. Set the selector to DO.
Set the agitation speed to 500 RPM.
Sparge Nitrogen into the vessel until the display is stable for approximately
5
minutes.
Set the mode switch to the "ZERO" position.
With the INC/DEC switch adjust the display for zero reading.
2.
Set the "SPAN".
Set the selector to DO.
Set the mode switch to "SPAN". Vigorously sparge air into the vessel. Set the
agitation speed to 500 RPM.
After about 30 minutes observe the reading on the display. After the DO
reading has stabilized. With the INC/DEC switch adjust the DO display
reading
to
100.
3.8
SELECTION OF MEDIUM FLOW RATE
Medium flow rate depends on the bore size of the tubing and percentage of the time
that nutrient pump will be running (at constant speed).
Nutrient Pump (Seconds):
M1226-0050 13
Summary of Contents for BIOFLO III
Page 2: ......
Page 7: ......
Page 9: ...M1226 0050 2...
Page 37: ...M1226 0050 30...
Page 40: ...M1226 0050 33...
Page 48: ...FIGURE 1 VESSEL SCHEMATIC M1226 0050 41...
Page 49: ...FIGURE 2 SAMPLING SYSTEM M1226 0050 42...
Page 50: ...FIGURE 3 FLOWMETER CONVERSION M1226 0050 43...
Page 51: ...FIGURE 4 FRONT PANEL M1226 0050 44...
Page 52: ...FIGURE 5 REAR OF CABINET M1226 0050 45...
Page 53: ...FIGURE 6 SWITCH PANEL M1226 0050 46...
Page 54: ...FIGURE 7 EXTERNAL NUTRIENT PUMP TERMINAL M1226 0050 47...
Page 55: ...FIGURE 8 SUGGESTED IMPELLER LOCATION M1226 0050 48...
Page 56: ...FIGURE 9 HEADPLATE M1226 0050 49...
Page 57: ...FIGURE 10 SPARGER TUBE M1226 0050 50...
Page 58: ...FIGURE 11 HARVEST TUBE M1226 0050 51...
Page 59: ...FIGURE 12 THERMOWELL M1226 0050 52...
Page 60: ...FIGURE 13 FOAM PROBE M1226 0050 53...
Page 61: ...FIGURE 14 BAFFLE INSTALLATION M1226 0050 54...
Page 62: ...FIGURE 15 SIDE PORTS M1226 0050 55...
Page 63: ...FIGURE 16 pH PROBE INSTALLATION M1226 0050 56...
Page 64: ...FIGURE 17 D O PROBE PHOENIX INSTALLATION M1226 0050 57...
Page 65: ...FIGURE 18 D O PROBE INGOLD INSTALLATION M1226 0050 58...
Page 66: ...FIGURE 19 CONVERSION OF D O PORT TO INOCULATION PORT M1226 0050 59...
Page 67: ...FIGURE 20 EXHAUST CONDENSER INSTALLATION M1226 0050 60...
Page 68: ...FIGURE 21 RESTRICTOR IN CONDENSER WATER IN LINE M1226 0050 61...
Page 69: ...FIGURE 22 DISASSEMBLY OF CONDENSER M1226 0050 62...
Page 70: ...FIGURE 23 FACTOR AFFECTING pH CONTROL M1226 0050 63...
Page 86: ...M1226 0050 79...
Page 87: ...FIGURE 25 BEARING HOUSING ASSEMBLY M1226 0050 80...
Page 88: ...FIGURE 26 BEARING HOUSING IN STERILIZATION M1226 0050 81...
Page 89: ...M1226 0050 82...
Page 90: ...M1226 0050 83...
Page 91: ...M1226 0050 84...
Page 92: ...M1226 0050 85...