CHAPTER 3
PREPARATION AND OPERATION
3.1
CLEANING OF VESSEL
1.
Fill the vessel with a mild detergent and water solution. Let stand for one hour
then scour thoroughly. Use a brush on both inside and outside surfaces.
2.
Drain the vessel and rinse several times with tap water. Repeat rinsing with
distilled water and let dry.
3.2 VESSEL
ASSEMBLY
1.
Slide impellers on the shaft of the bearing housing and clamp them down.
Lower impeller should be positioned about 1/4 inch above the bottom of the
baffle. Upper impeller one to one and half impeller diameters above lower
impeller
(Fig.
8).
Working From the Underside of the Headplate (Fig. 9)
2.
Insert the sparger tube in the sparger port (Fig. 10).
3.
Insert the harvest tube in the harvest port (Fig. 11).
Working From the Top of the Headplate
4.
Insert the thermowell tube into the temperature port* (Fig. 12).
5.
Insert the sampler assembly into the sample port (Fig. 2).
6.
Install foam probe in the headplate (Fig. 13).
7.
Install the baffle assembly inside of the glass jar by pressing the two edged
baffle together (Fig. 14).
8.
Install four polypropylene ports or plugs in the wall of the glass jar. Be sure to
use a blind plug when a port is not in use (Fig. 15).
9.
Lubricate the headplate O-ring with silicone grease.
10.
Place the headplate on the flange of the vessel and lock it to the clamping ring
with
knurled
screws.**
11.
Install pH and DO probes (Fig. 16, 17, 18).*** Coat probe with glycerin
M1226-0050 8
Summary of Contents for BIOFLO III
Page 2: ......
Page 7: ......
Page 9: ...M1226 0050 2...
Page 37: ...M1226 0050 30...
Page 40: ...M1226 0050 33...
Page 48: ...FIGURE 1 VESSEL SCHEMATIC M1226 0050 41...
Page 49: ...FIGURE 2 SAMPLING SYSTEM M1226 0050 42...
Page 50: ...FIGURE 3 FLOWMETER CONVERSION M1226 0050 43...
Page 51: ...FIGURE 4 FRONT PANEL M1226 0050 44...
Page 52: ...FIGURE 5 REAR OF CABINET M1226 0050 45...
Page 53: ...FIGURE 6 SWITCH PANEL M1226 0050 46...
Page 54: ...FIGURE 7 EXTERNAL NUTRIENT PUMP TERMINAL M1226 0050 47...
Page 55: ...FIGURE 8 SUGGESTED IMPELLER LOCATION M1226 0050 48...
Page 56: ...FIGURE 9 HEADPLATE M1226 0050 49...
Page 57: ...FIGURE 10 SPARGER TUBE M1226 0050 50...
Page 58: ...FIGURE 11 HARVEST TUBE M1226 0050 51...
Page 59: ...FIGURE 12 THERMOWELL M1226 0050 52...
Page 60: ...FIGURE 13 FOAM PROBE M1226 0050 53...
Page 61: ...FIGURE 14 BAFFLE INSTALLATION M1226 0050 54...
Page 62: ...FIGURE 15 SIDE PORTS M1226 0050 55...
Page 63: ...FIGURE 16 pH PROBE INSTALLATION M1226 0050 56...
Page 64: ...FIGURE 17 D O PROBE PHOENIX INSTALLATION M1226 0050 57...
Page 65: ...FIGURE 18 D O PROBE INGOLD INSTALLATION M1226 0050 58...
Page 66: ...FIGURE 19 CONVERSION OF D O PORT TO INOCULATION PORT M1226 0050 59...
Page 67: ...FIGURE 20 EXHAUST CONDENSER INSTALLATION M1226 0050 60...
Page 68: ...FIGURE 21 RESTRICTOR IN CONDENSER WATER IN LINE M1226 0050 61...
Page 69: ...FIGURE 22 DISASSEMBLY OF CONDENSER M1226 0050 62...
Page 70: ...FIGURE 23 FACTOR AFFECTING pH CONTROL M1226 0050 63...
Page 86: ...M1226 0050 79...
Page 87: ...FIGURE 25 BEARING HOUSING ASSEMBLY M1226 0050 80...
Page 88: ...FIGURE 26 BEARING HOUSING IN STERILIZATION M1226 0050 81...
Page 89: ...M1226 0050 82...
Page 90: ...M1226 0050 83...
Page 91: ...M1226 0050 84...
Page 92: ...M1226 0050 85...