SKS - Steam to Steam Humidifier
Installation Instructions and User Manual
17
Stage 3
– Pipework for HTHW / Raw steam
STEAM
SKS
12" [30cm]
minimum
Vacuum breaker
(supplied by others)
Pressure gage
(supplied by others)
Vacuum breaker
(supplied by others)
Steam Trap (supplied by others)
Small capacity to eliminate possible
condensate from raw steam line
Cap
(supplied by others)
Cap
(supplied by others)
Condensate pocket
(supplied by others)
Diameter should be ½'
’ [25mm] higher
than condensate pipe
Float & thermostatic
steam trap
(supplied)
Actuated control valve
(supplied)
Shut off valve
(supplied by others)
Strainer
(supplied)
CONDENSATE
RETURN
Piping
(by others)
(Fig. 15)
Raw Steam Supply
& Condensate Installation
Connect the raw steam inlet to an adequate steam supply with steam
control valve, strainer, isolating valve and small capacity trap.
One control valve is required for each raw steam inlet.
Control valve must be fitted with a mechanism and be electrically wired
so that the valve returns to the closed position when no air flow is
detected in the AHU.
In case of two (2) condensate outlets, each individual condensate outlet
requires a steam trap
. Do not ‘’group trap’’.
Float and thermostatic type steam traps are recommended and must be
fitted no less than 30cm below the condensate outlets, with condensate
pocket fitted before the trap.
Summary of Contents for SKS-100-SLP
Page 38: ...Notes...
Page 39: ......