9 8-Way Smart IO Board Setup
41
To set up the network successfully, follow these steps:
1. Configure all Ethernet Modules installed on the 8-way Smart IO Board, Nemlinks and
8-way Relay Boards by referring to section 5.
2. For the 8-way Smart IO Board:
a. Disconnect the power connector. [1]
b. Configure the address of the board to 1, by populating jumpers JP7 1, 2, 4
and 16. Refer to section 6.1 step 5b for more detail. [2]
c. Populate jumper JP7 A to put the board in programming mode. [3]
d. Jumper JP7 C is only used when the board is connected to a Druid energizer.
When the jumper is populated, the Smart IO board will force the state of its
inputs onto the energizer and no changes will be possible on the energizer
itself. When the jumper is not populated changes are possible on the energizer
and the Smart IO board will only change the energizer state, once a change on
the Smart IO board inputs happen. [3]
e. Jumpers JP7 B and D can either be populated, or not. [3]
f. Connect the Smart IO board to a computer, using and ethernet cable. [4]
2
3
4
1
5