13
FIGURE 3A - ASSEMBLED LAYOUT WITHIN BIN
ASSEMBLED LAYOUT WITHIN BIN
Dimension “X” Must be a Mini
-
mum of 10 1/4”
(260.5 mm)
“X
”
Center of T
rack
Eave
Eave Height
“Y
”
“Y” = 3” for Bins Up to 30’ “Y” = 4” for Bins 36’
and Over
Bottom
of Augers
Concrete Pad
Drying Floor
Height
Top of
Drying Floor
Sp
ace B
elo
w t
hi
s L
in
e M
us
t b
e U
no
bs
tr
uc
te
d
Eave
Maximum Fill Height
22”
(560 mm)
The Height of the Beam at the Center of the Bin
Needs to be Higher than the
Height of the Beam at the Bin W
all*
*
To Determine How Much Higher the Beam Needs to be at the Center of the Bin than at the Bin W
all, Use the Following:
Proper
Adjustment is 1/8”
per foot of Beam Length
Example:
a beam for a 24’
bin is 13’
long, therefore it
would be 1 5/8” higher at the center than at the bin wall.
Summary of Contents for STIR-RITE III
Page 30: ...30 SCHEMATIC 460V 3PH WITH NO STALL TIMER...
Page 32: ...32 SCHEMATIC 230V 1PH 3PH WITH STALL TIMER NOTE Set the stall timer to 45 minutes...
Page 33: ...33 SCHEMATIC 460V 3PH WITH STALL TIMER NOTE Set the stall timer to 45 minutes...
Page 48: ...48 STIR RITE III OVERALL ASSEMBLY REPLACEMENT PARTS...
Page 54: ...54 TROLLEY ASSEMBLY...