Chapter
6
- Specifications and Parts List
Chapter
6
6 - 35
S
ECTION
6-2
PARTS LIST
Common Equipment
Description
Part Number
9.5” Controlling/Base Chassis - 3 blade chassis (IP3NA-3KSU-B1)
9.5” Expansion Chassis - 3 blade expansion chassis (IP3WW-3KSU-E1)
19” Chassis - 6 blade chassis (IP3NA-6KSU-A1)
Upper Joint Bracket Set (IP3WW-UPPER JOINT BRACKET SET)
Blank Slot Cover Set for 9.5” or 19” Chassis (IP3WW-BLANK SLOT COVER SET)
AC Power Cable (IP3NE- AC Power Cable -US)
0910000
0910002
0910004
0910011
0910012
670529
9.5” Chassis Battery Box, short term (10 minutes) (IP3WW-SMALL BATT BOX)
(requires Battery Set, P/N 670511)
9.5” or 19” Chassis Battery Box, long term (3 hours) (IP3WW-LARGE BATT BOX)
(requires Battery Set, P/N 670512)
19” Chassis Battery Box, short term (10 minutes) (2.3AH-12V BATT)
Long Term Battery Box Rack Mount Bracket Set (IP3WW-L BATT BOX RACK MOUNT BRACKET)
Battery Mount for 6-Slot Chassis
Short Term Battery Set (12V 0.8Ah Battery) for 9.5” 3-Slot Chassis (IP3WW-SMALL BATT SET)
: Includes 2 Batteries
Short Term Battery Set for 19 6-Slot Chassis
Long Term Battery Set (12V 0.8Ah) (IP3WW-LARGE BATT SET) : Includes 3 Batteries
Battery Cable for Internal Battery 2U Chassis (IP3WW -BATT CABLE -INT BATT)
Battery Cable for External Battery 2U Chassis (IP3WW -BATT CABLE -EXT BATT)
0910006
0910007
0910009
0910014
670509
670511
670533
670512
670530
670531
Floor Mount Bracket Set for 9.5” Chassis (IP3WW-STD BRACKET SET)
Floor Mount set for all Chassis when using Long Term Battery Box (3 Blade, 6 Blade and CPU
blade for IPS) (IP3NE-FLOOR MOUNT SET)
Rack Mount Set for 6-Slot Chassis (IP3WW-STD BRACKET SET)
Wall Mount Set for 6-Slot/CPU Blade Chassis
Rack Mount Set for 3-Slot Chassis (IP3-STD BRACKET SET)
0910013
670019
670508
670510
670513
0910008
Summary of Contents for UX5000
Page 12: ...x Table of Contents Table of Contents...
Page 18: ...1 6 Chapter 1 Chapter 1 Installing the Chassis...
Page 26: ...1 14 Chapter 1 Chapter 1 Installing the Chassis...
Page 84: ...1 72 Chapter 1 Chapter 1 Installing the Chassis...
Page 90: ...2 4 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 98: ...2 12 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 113: ...Chapter 2 Blade Installation and Startup Chapter 2 2 27 Figure 2 11 EXIFU CABLING...
Page 144: ...2 58 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 172: ...2 86 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 174: ...2 88 Chapter 2 Chapter 2 Blade Installation and Startup...
Page 208: ...4 14 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 212: ...4 18 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 220: ...4 26 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 222: ...4 28 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 224: ...4 30 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 226: ...4 32 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 228: ...4 34 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 254: ...4 60 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 260: ...4 66 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 274: ...4 80 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Page 284: ...5 4 Chapter 5 Chapter 5 LAN Connection...
Page 332: ...vi Index Index...